|
International Audit of Reserves (JORC Code)
Mineral resources according to JORC Code as of 1 January 2009 (Resources are inclusive of reserves)
|
|
Measured |
Indicated |
Total measured and indicated |
|
Deposit |
Ore (million tonnes) |
Grade (g/t) |
Gold content (k oz) |
Ore (million tonnes) |
Grade (g/t) |
Gold content (k oz) |
Gold content (k oz) |
|
Existing operations |
|
Olimpiada1 |
19,3 |
5,00 |
3 131 |
79,8 |
3,70 |
9 616 |
12 747 |
|
Kuranakh1 |
1,8 |
1,90 |
106 |
160,4 |
1,20 |
6 447 |
6 553 |
|
Zapadnoye1 |
0,3 |
1,80 |
17 |
5,6 |
3,00 |
542 |
559 |
|
Lenzoloto1 |
32,1 |
0,22 |
237 |
169,8 |
0,42 |
2 091 |
2 328 |
|
Subtotal |
53,5 |
2,03 |
3 491 |
415,6 |
1,40 |
18 696 |
22 187 |
|
Projects |
|
Blagodatnoye5 |
3,4 |
2,50 |
271 |
132,8 |
2,40 |
10 230 |
10 501 |
|
Natalka2 |
163,9 |
1,74 |
9 166 |
626,9 |
1,52 |
30 543 |
39 709 |
|
Verninskoye1 |
- |
- |
- |
31,5 |
2,20 |
2 248 |
2 248 |
|
Olenye1 |
- |
- |
- |
0,4 |
7,40 |
100 |
100 |
|
Titimukhta3 |
9,7 |
3,10 |
950 |
17,6 |
3,10 |
1 750 |
2 700 |
|
Chertovo Koryto4 |
4,1 |
1,85 |
247 |
46,4 |
1,84 |
2 742 |
2 989 |
|
Subtotal |
181,1 |
1,83 |
10 643 |
855,5 |
1,73 |
47 613 |
52 247 |
|
Total |
234,6 |
1,87 |
14 125 |
1271,1 |
1,62 |
66 309 |
80 434 |
|
|
Inferred |
|
|
|
|
|
|
Ore (million tonnes) |
Grade (g/t) |
Gold content (k oz) |
|
|
|
|
|
Existing operations |
|
Olimpiada1 |
37,2 |
3,10 |
3 666 |
|
|
|
|
|
Kuranakh1 |
7,3 |
1,50 |
346 |
|
|
|
|
|
Zapadnoye1 |
1,7 |
3,40 |
181 |
|
|
|
|
|
Lenzoloto1 |
29,2 |
0,62 |
520 |
|
|
|
|
|
Subtotal |
75,4 |
1,94 |
4 713 |
|
|
|
|
|
Projects |
|
Blagodatnoye5 |
36,1 |
2,20 |
2 555 |
|
|
|
|
|
Natalka2 |
472,4 |
1,42 |
21 538 |
|
|
|
|
|
Verninskoye1 |
4,4 |
3,10 |
446 |
|
|
|
|
|
Olenye1 |
0,7 |
6,90 |
150 |
|
|
|
|
|
Titimukhta3 |
3,6 |
2,40 |
270 |
|
|
|
|
|
Chertovo Koryto4 |
2,1 |
1,64 |
109 |
|
|
|
|
|
Subtotal |
519,2 |
1,50 |
25 068 |
|
|
|
|
|
Total |
594,7 |
1,56 |
29 781 |
|
|
|
| |
1. Audited in October 2006 by Micon International Co. Ltd. 2. Audited in July 2007 by Micon International Co. Ltd. 3. Audited in July 2008 by Micon International Co. Ltd. 4. Audited in January 2008 by Micon International Co. Ltd. 5. Audited in November 2008 by Micon International Co. Ltd.
Ore reserves according to JORC Code as of 1 January 2009
|
|
Proved |
Probable |
Total proved and probable |
|
Deposit |
Ore (million tonnes) |
Grade (g/t) |
Gold content (koz) |
Ore (million tonnes) |
Grade (g/t) |
Gold content (k oz) |
Gold content (k oz) |
|
Existing operations |
|
Olimpiada1 |
19,0 |
4,90 |
3 005 |
87,0 |
3,60 |
10 041 |
13 046 |
|
Kuranakh1 |
- |
- |
- |
31,9 |
1,60 |
1 646 |
1 646 |
|
Zapadnoye1 |
- |
- |
- |
4,4 |
2,80 |
394 |
394 |
|
Lenzoloto1,6 |
12,5 |
0,32 |
1287 |
228,1 |
0,52 |
1 603 |
1 731 |
|
Subtotal |
31,5 |
3,09 |
3 133 |
332,7 |
1,87 |
13 684 |
16 817 |
|
Projects |
|
Blagodatnoye5 |
3,1 |
2,30 |
226 |
132,1 |
2,27 |
9 663 |
9 859 |
|
Natalka2 |
242,3 |
1,30 |
10 291 |
883,1 |
1,10 |
30 550 |
40 841 |
|
Verninskoye1 |
- |
- |
- |
17,1 |
3,00 |
1 657 |
1 657 |
|
Olenye1 |
- |
- |
- |
0,5 |
6,40 |
99 |
99 |
|
Titimukhta3 |
7,7 |
3,30 |
817 |
13,4 |
3,30 |
1 422 |
2 239 |
|
Chertovo Koryto4 |
3,8 |
1,80 |
218 |
39,8 |
1,84 |
2 352 |
2 570 |
|
Subtotal |
256,9 |
1,40 |
11 552 |
1 086,0 |
1,31 |
45 713 |
57 265 |
|
Total |
288,4 |
1,58 |
14 685 |
1 314,1 |
1,41 |
59 397 |
74 082 | |
1. Audited in October 2006 by Micon International Co. Ltd. 2. Audited in July 2007 by Micon International Co. Ltd. 3. Audited in July 2008 by Micon International Co. Ltd. 4. Audited in January 2008 by Micon International Co. Ltd. 5. Audited in November 2008 by Micon International Co. Ltd. 6. Measured in 000's of m3. 7. Measured in g/m3 of extracted gold.
Total mineral resources and ore reserves as of 1 January 2009 (Reserves and resources according to JORC Code)
| Classification |
Category |
Ore (million tonnes) |
Grade (g/t) |
Gold content (k oz) |
|
Resources1,2 |
Measured |
234,6 |
1,87 |
14 100 |
|
|
Indicated |
1271,1 |
1,62 |
63 800 |
|
|
Total measured and indicated |
1505,7 |
1,66 |
77 900 |
|
|
Inferred |
594,7 |
1,57 |
30 117 |
|
|
Total measured, indicated and inferred |
2100,4 |
1,63 |
110 215 |
|
Reserves1 |
Proved |
288,4 |
1,58 |
14 685 |
|
|
Probable |
1 314,1 |
1,41 |
59 397 |
|
|
Total proved and probable |
1602,5 |
1,44 |
74 082 | |
1. Lenzoloto gravel volumes converted using bulk density of 2t/m3. 2. The mineral resources estimated for each deposit are given for the whole deposit and include mineral resources attributable to minority shareholders' interests in Polyus Gold's subsidiaries.
Mineral resources and ore reserves of the Titinukhta gold deposit, Severo-Yeniseysk area, Krasnoyarsk region RF. July 2008 Download in PDF (2,3 Mb)
Micon report on Chertovo Koryto deposit. January 15, 2008. Download in PDF (2,5 Mb)
Micon report on Natalka deposit. July, 2007. Download in PDF (2 Mb)
Polyus Gold Reserves and Resources by JORC Code as of 1st January 2006. Download in PDF (85 Кb)
SRK Consulting Audit Report of Nezhdaninskoe Deposit. February, 2006. Download in PDF (405 Кb)
SRK Consulting Audit Report of Kuranakh Ore Field. February, 2006. Download in PDF (365 Кb)
SRK Consulting Audit Report of Kyutchus Deposit. February, 2006. Download in PDF (158 Кb)
Micon International Audit Report of Olimpiada and Blagodatnoe Deposits. May, 2006. Download Part 1 in PDF (3,4 Mb) Download Part 1 in PDF (1,3 Mb)
|